Pre-formed cavity closer's are a great way to increase efficiency and reduce errors on site.
Shire Construction Products manufacture the A-Frame Former system giving the confidence of quality with BBA certification.
Speed and accuracy is the name of the game with our 5-7 day lead-time from receipt of order.
The A-Frame Former cavity closer's offers flexibility with its rigid system.
We aim to return quotations within 24/48 hours – Take off from drawings may take longer.
Shire Construction Products, offer the highest quality BBA certified cavity closer's at a competitive price.
Our cavity closer's can be manufactured as 2, 3 or 4 sided frames or as a combination T or P shaped flags
We offer the A-Frame system in standard and fire rated frames from 50mm to 300mm, with the option of check reveal.
Sit the Frame Former into the cavity at sill level
Ensure the frame is plumb and square
Hold the Frame Former in place with a batten/plank
Brick/block up to the top of the closer using it as a brick-work guide, continue to check for level
Brick ties to be fitted at 250mm centres staggered front and back.